Construction update: Feb. 2008
Thanks to my Dad we've made progress on our construction project. We've still got a lot to accomplish but things are starting to take shape. The master bedroom, closet and master bathroom are framed in and the electric, cable and telephone has been wired. We also had central air and heating installed earlier this month and are just waiting to have the electricity connected.
(with all the insullation being stored in there until we can put it up this weekend)
This is another view of the bathroom (from the bedroom)
View of the master bedroom from the upper left corner
View of the master bedroom from just right of the doorway
Our walk in closet (7ftx 12 ft!)
This is where the door to our private deck will go.
Its framed we just need to install the door.
This is another view of the bathroom (from the bedroom)
View of the master bedroom from the upper left corner
View of the master bedroom from just right of the doorway
Our walk in closet (7ftx 12 ft!)
This is where the door to our private deck will go. Its framed we just need to install the door.



























This is PIG. He is also one of the Saulnier pets.